Does anyone know what is going in next to the medical centre @ 535 Belmont? Excavation has begun.
I don't see anything for 535 Belmont, but there have been building permits for it's neighbouring property.
Site Address 539 BELMONT AVE W
Permit No 10112313
Work Description PERMIT IS FOR THE BALANCE OF CONSTRUCTION FOR A 11 STOREY 114 UNIT APARTMENT BUILDING WITH 1 BELOW GRADE PARKING LEVEL.
Status Under Review
Permit Category Residential Building (Multi)
Permit Type Apartment
Application Date April 29, 2010
Issued By
Issue Date
Final Date
Work Proposed New Construction
Construction Value 17750000
Residential Units on Property 114
Special Conditions See address change request in street file for 539 Belmont Ave W. NEED LIST OF UNITS NEED DRAWING SHOWING UNIT LAYOUT & NUMBERING FOR BARB F.
Contractor TRICAR DEVELOPMENTS INC
Contractor Contact Info 3800 COLONEL TALBOT RD LONDON ON N6P 1H5 phone 519- - phone2 519- -
LAND_USE_SUBCATEGORY MULTIPLE
AREA 5346.9454355
LEN 343.77929294407
Site Address 539 BELMONT AVE W
Permit No 09122898
Work Description PERMIT IS FOR A FOUNDATION ONLY FOR A 11 STOREY 114 UNIT APARTMENT BUILDING WITH 1 BELOW GRADE PARKING LEVEL - NO MECHANICAL, NO ELECTRICAL. SEPARATE PERMIT REQUIRED FOR BALANCE OF CONSTRUCTION.
Status Issued
Permit Category Residential Building (Multi)
Permit Type Apartment
Application Date November 25, 2009
Issued By MARTINAS
Issue Date April 21, 2010
Final Date
Legal Description PLAN 402 PT LOTS 15 & 16 RP 58R2550 PARTS 3 4 5 & 7
Work Proposed Foundation - Only
Construction Value 1500000
Residential Units on Property 0
Special Conditions See notes on drawings. All work shall comply with the 2006 Building Code Final Inspection Deposit waived. See address change request in street file for 539 Belmont Ave W.
Contractor TRICAR DEVELOPMENTS INC
Last edited by UrbanWaterloo; 07-07-2010 at 01:43 AM.
Thanks, I wasn't sure the address of that empty property (535 is the medical centre). Looks to be a decent sized building for that area. Interested to see what the final drawings look like. The Tricar Developments site doesn't mention a Kitchener building yet.
Last edited by garthdanlor; 05-02-2010 at 09:57 PM.
There was a project called Five 39 BV that was talked about a couple years ago, I wonder if it's the same thing.
From the The Record January 19, 2010
London developer plans 11-story high rise
KITCHENER — The Tricar Group of London, Ont., is planning an 11-storey apartment building on Belmont Avenue near Gage Avenue in Kitchener. The company recently purchased the property and has taken out a building permit for the footings, foundations and underground parking for the project, located at 539 Belmont Ave. W. Currently, the site is vacant. Tricar built the high-rise apartment building at Weber and Queen streets in Kitchener.
For this one, I'm not expecting a much quality in the urban design department, but at least it's neither uptown nor downtown.
Least it has u/g parking and is close to Belmont Village.
Staff are supposed to get around to making Belmont Avenue West a mixed-use corridor sometime towards the end of this year. This section will be included.
Yup, although given how behind they are on the other sections, expect the BV mixed use corridor to happen in about a year from now.Originally Posted by mpd618
Too bad this one won't be mixed use.
There's currently a hole on the site quite a ways back from the street. I hope everyone's looking forward to street-fronting parking....Originally Posted by Urban_Enthusiast86
May 24, 2010
![]()
Well I hope you're wrong, but I don't think you are unfortunately. If this passed with surface parking along the street, the city is on crack.
With existing zoning, the developer is probably fully within their rights to put surface parking between the street and the building. This is why I hope the city gets on rezoning this corridor pronto.Originally Posted by Spokes
Im right there with ya, but I wouldn't hold my breath. The way they've taken their time with the other ones this one's at least a year away.Originally Posted by mpd618
The pieces of crane are on site, expect to see this one go up this week.
Building Footprint
July 6, 2010
![]()
The crane's up.
So it looks like the hole is right up to the front of the property in almost the whole lot. Great news since we thought initially there would be a big front yard/parking lot out front. This may just be for the underground parking though, and the building may still be quite set back.
August 2, 2010
Visible to the right of the Lang Tannery smokestack.
![]()