Greg Moore
11-14-2010, 10:08 AM
The work crew erected the hotel - a soundproofed, thermal-insulated structure reportedly built to withstand a magnitude 9 earthquake - with all prefabricated materials. In other words, a crew of off-site factory workers built the sections, and their on-site counterparts arranged them on the foundation for the Ark project.
Ps0DSihggio
And we thought BPR was fast construction. :)
Article link (http://goo.gl/iwFIh)
Ps0DSihggio
And we thought BPR was fast construction. :)
Article link (http://goo.gl/iwFIh)